Tilly Project
Other projects
Tilly, a promising potential
In 2023, the Tilly project was added to our portfolio. Located just 20 km southeast of our Adina Lithium project, Tilly lies along a major east-west structural corridor. Its proximity to other intrusive rock formations (i.e., produced by the deep cooling of magma), considered to be the parent sources of the lithium-cesium-tantalum pegmatites (LCT) of Adina and other areas in the region, makes it a strategic location.
The exploration strategy envisaged for Tilly will be based on the successful Adina strategy. This will include visual identification of pegmatite stones, rock chip sampling and soil sampling. These steps could be accompanied by stripping to further expose the rock formations of interest at surface, followed by channel sampling.
Exploration Work Planning for 2026: Click here
MERN Notice regarding the new obligations of holders of exclusive exploration rights for annual work planning: https://www.mern.gouv.qc.ca/wp-content/uploads/AV_Planification_annuelle_travaux.pdf

Thanks to its similar geology and proximity to Adina, any significant discoveries at Tilly can be incorporated into the development plans for Adina and Cancet, further strengthening their potential.
The technical information herein has been prepared in accordance with the Canadian regulatory requirements set out in NI 43-101 and reviewed on behalf of the Company by Mr. Antoine Fournier, P.Geo, a Qualified Person and registered permit holder with the Ordre des Géologues du Québec (#0516)
Winsome follows standard industry practices regarding quality assurance/quality control protocols for its exploration and drilling programs. Please see relevant press releases for details related to specific programs. All data is verified by Company geologists under the supervision of Mr Fournier.
- Mining titles:
- 91
- Project area:
- 47 km²
- Type of work in progress:
- Prospecting
- Drilling completed:
- 0 m
- Traditional territory:
- Mistissini
More to come