Project Tilly

Key points

Mining titles:
91
Project area:
47 km²
Type of work in progress:
Prospecting
Drilling completed:
0 m
Traditional territory:
Mistissini

Other active projects

Tilly, a promising potential

In 2023, the Tilly project was added to our portfolio. Located just 20 km southeast of our Adina Lithium project, Tilly lies along a major east-west structural corridor. Its proximity to other intrusive rock formations (i.e., produced by the deep cooling of magma), considered to be the parent sources of the lithium-cesium-tantalum pegmatites (LCT) of Adina and other areas in the region, makes it a strategic location.

The exploration strategy envisaged for Tilly will be based on the successful Adina strategy. This will include visual identification of pegmatite stones, rock chip sampling and soil sampling. These steps could be accompanied by stripping to further expose the rock formations of interest at surface, followed by channel sampling.

Projet Tilly - Winsome resources

Thanks to its similar geology and proximity to Adina, any significant discoveries at Tilly can be incorporated into the development plans for Adina and Cancet, further strengthening their potential.